Final pre insulation and drywall tasks at the semi detached project

sean kollee January 6, 2018

With rough in of the central vacuum system and spray foam on the rim joist and cantilevers, we are ready to start insulation.   

 

IMAGE.JPG

The many hard to reach areas get sprayed and are no longer an issue for heat loss and air leakage.  