With damproofing done, electrical conduit run where it needs to be and weeping tile in place the last task before backfill is the gravel. The gravel cover goes on the weeping tile to bed it in place and ensure any groundwater can flow into the weeping tile. Site access was poor however the slinger truck was able to make it work.
Lots of conduit for electrical lines later that run below the slab.